IEC 61557-7:2019 states the requirements for measuring equipment that tests the phase sequence in three-phase distribution systems, where the indication may be mechanical, visual or audible. The document does not apply to additional measurements of other quantities and does not apply to monitoring relays.

ProvenanceIEC 61557-7:2019 supports data record std.iec-61557-7.scope, which is cited on the entry Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence.SOURCEIEC 61557-7:2019IEC 61557-7:2019Publisher catalogDATA RECORDstd.iec-61557-7.scopestd.iec-61557-7.scopeVerified 2026-10-27ENTRYElectrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequenceElectrical safety in low..No revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Subject
Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence (Standards)
Kind
Standard scope
Source
IEC 61557-7:2019, Electrical safety in low voltage distribution systems up to 1 000 V AC and 1 500 V DC - Equipment for testing, measuring or monitoring of protective measures - Part 7: Phase sequence, IEC. Publisher page

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-27created
2026-10-27review_status unreviewed -> software_reviewed

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record std.iec-61557-7.scope." Test Instrument Reference. 2026-10-27. https://www.testinstrumentreference.com/data/std.iec-61557-7.scope/.